01 / FIELD NOTE

Clarify which roof-edge work belongs in each scope.

A reroof and gutter project can meet at the same edge while covering different work. Before scheduling, ask who is responsible for roof covering and flashing, fascia observations or replacement, existing gutter removal, new attachment, outlets, downspouts, and cleanup. Put those boundaries in writing instead of assuming one contractor includes another trade’s work.

02 / FIELD NOTE

Keep drainage capacity visible during roof planning.

Florida roofing guidance notes that drainage capacity should be considered when roof work affects drainage details. Identify the contributing roof planes, valleys, current outlets and downspouts, discharge areas, and observed overflow points. PrimeFlow can assess the proposed above-ground route; roof-system design, permitting, and code decisions stay with the appropriate parties.

03 / FIELD NOTE

Plan the gutter after relevant roof-edge conditions are known.

The seamless-gutter layout should be checked against the final visible roof edge, fascia, geometry, valleys, access, outlet positions, downspout route, and discharge area. Six-inch or qualifying 7-inch profiles, oversized downspouts, and guards are property-specific decisions. A reroof does not automatically require a particular gutter size.

04 / FIELD NOTE

Separate fascia coordination from roof-leak diagnosis.

The fascia often provides the gutter mounting plane, but its repair or replacement may not be included in a roofing or gutter proposal unless written. PrimeFlow reviews visible fascia and attachment options relevant to its scope. A roof leak can involve roof covering, flashing, penetrations, underlayment, or other conditions that require an appropriate roofing evaluation.

05 / FIELD NOTE

Use a coordinated schedule and final walkthrough.

Confirm access, removal sequence, material timing, roof-edge readiness, communication responsibility, cleanup, and what happens if visible conditions change. At completion, keep both scopes, material and color selections, photos of visible work, exclusions, and warranty documents so the owner can identify what each trade agreed to complete.